Drawings Print

Design Outcome

DWG

Title

SW01

Embedment & Trenchfill

SW02

Pipe Embedments – Standard Embedment for Flexible Pipes

SW03

Pipe Embedments – Standard Embedment for Concrete Pipes

SW04

Stormwater Service Connections

SW05

Standard Stormwater Manhole

SW06

Stormwater Manholes – Non-Access Chamber

SW07

Stormwater Manhole with In Situ Concrete Base

SW08

Stormwater Manhole Offtake

SW09

Stormwater Manhole Access

SW10 to SW18

Deleted. Refer to ATCOP drawing set.

SW19

Stormwater Inlet and Outlet Structures

SW20

Stormwater Inlet and Outlet Structures (Safety Fences)

SW21

Debris Control Screen

SW22

Stormwater Pipe and Manhole Construction Clearance Requirements

SW23

Stormwater Lines – Steep Gradients and Anchor Blocks

SW24 – Sheet 1

Stormwater Boundaries – Connections in Road Reserve

SW24 – Sheet 2

Stormwater Boundaries – Connections in Reserve Land

SW25

Auckland Transport (AT) Ownership Case

SW26

Connection to Existing Auckland Transport Catchpit Leads

SW27

Auckland Council Parks (Community Services) – General Ownership Case

SW28

Auckland Council Parks (Community Services) – Responsibility from Service Level Agreement

SW29

Auckland Council Parks (Community Services) – Ownership & Responsibilities for SW Treatment ​​

Better Design Practice

Rules of Thumb

Provide Feedback Next Page   Previous Page